Skip to main content

An official website of the United States government

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

  1. Home
  2. Newsroom
  3. Documents Library
  4. Final Environmental Assessment and Finding of No Significant Impact for the New Niagara Falls Border Patrol Station, U.S. Border Patrol Buffalo Sector, New York

Final Environmental Assessment and Finding of No Significant Impact for the New Niagara Falls Border Patrol Station, U.S. Border Patrol Buffalo Sector, New York

CBP announces that a Final Environmental Assessment (EA) for the New Niagara Falls Border Patrol Station, U.S. Border Patrol Buffalo Sector, New York and associated Finding of No Significant Impact (FONSI) have been prepared and are now available for public review.  The Final EA documents a review of the potential environmental and socioeconomic effects associated with the construction, operation, and maintenance of a new Niagara Falls Border Patrol Station.  

The Draft EA was made available for a 30-day public review and comment period between 9 November 2021 and 9 December 2021.  It was accessible through CBP.gov and by distribution to stakeholders and local public libraries.  The notice of availability for the draft was published in the Niagara Gazette on 9 November 2021.  

Based on the Final EA, a determination was made that the proposed action will not significantly affect the human environment and that further analysis is not required.  Therefore, a FONSI was issued, and an Environmental Impact Statement is not required.  For further information contact Mr. John Petrilla at BPAMNEPA@cbp.dhs.gov.

Attachment Ext. Size Date
Final EA and FONSI for the New Niagara Falls BPS, New York PDF 4.77 MB 02/16/2023

CBP Publication Number

3026-1222

Last Modified: Feb 16, 2023